The system is made up of pre-assembled groups (skids) complete with instrumentation and equipment and the relevant operating systems relating to the no. 2 furnaces BG2 and BG3. Design, supplies and assembly include:
Thick oil deposit: Fuel oil storage tank Fuel oil transfer and push pump room Thermal power plant Local electrical panels and general electrical systems Process management system with plc Daily tank area
Skid hosting the armored electric exchangers for heating the oil Filtration, measurement and flow rate regulation skid intended for the oven combustion burners Compressed air pressure regulation skid, at the pressures necessary for the OCD atomization, burner washing and cooling phases. Ocd inversion skid and compressed air to the oven burners OCD ramps and compressed air service to the individual burners and related burners Piping ocd and compressed air Btz thick oil furnace combustion burners ODC heating system with self-regulating heating cable.
General power supply of electrical systems: The following lines will be derived from the general LV panel of furnace cabin 2: The following lines will be derived from the general LV panel of furnace booth 3
Supervision, process management and monitoring systems Preparation of washing system Construction supervision Technical assistance Certifications