References


2019


Bormioli Rocco - Altare

Demolition, reconstruction and start up of furnace 1

Saint Gobain - Calarasi Float

Hot works during Float reconstruction

Bormioli Pharma - San Vito

Furnace project, carpentry, plants engineering. Demolition, reconstruction and start up of furnace SV2

Bormioli Pharma - Bergantino

Furnace, carpentry and plants engineering. Demolition, reconstruction and start up of furnace BR1

2020

Bormioli Pharma - San Vito

Demolition, reconstruction and start up of furnace SV1

Bormioli Luigi - Parma

Full reconstruction, supply of plants, refractory and carpentry.

Technoglas Gmbh - Austria

​​​​​​​Full reconstruction, pre-heating and start up

Zignago Vetro - Empoli

Partial reconstruction, carpentry supply, controlled cooling, pre-heating and start up.

Eurofibre S.p.A.  Marcon

Complete design of the furnace for the requalification of internal cullet. Innovative project of submerged Combustion Melter.

2021

Bormioli Pharma S.p.A. Bergantino

Furnace BG1: complete reconstruction, (plants, refractory materials, steel structures), supply of steel structures, refractory materials and equipment, pushing and sealing of electrodes. Heat-up and start-up of the furnace.

Saint Gobain Pisa 

Complete overcoating and sealing of float furnace.

Bormioli Rocco S.p.A. Altare

Forehearth 11 at F1 Altare: demolition (refractory materials, steel structures), reconstruction (refractory materials, steel structures) and heat-up.

Bormioli Rocco S.A. Azuqueca

Forehearth 24 at F2  : demolition (refractory materials, steel structures), reconstruction (refractory materials, steel structures) and heat-up.

Vetrerie Riunite Verona

Forehearth 10: design of refractory materials, steel structures and plants, supply and installation of plants, refractory materials, and steel structures. Heat-up and start-up.

2022

Bormioli Pharma S.p.A. San Vito

Furnace Sv1: steel and refractories engineering for furnace and forehearths.

Bormioli Pharma S.p.A Bergantino

Furnace BG3: equipment and steel engineering. Demolition and partial reconstruction of equipment, refractories and carpentries. Steel, equipment and refractories supply, draining,  preheating and  start up (July 2022)

Verallia Italia S.p.a. Dego

Furnace 13: demolition, reconstruction (refractories, carpentries), steel supply.

Vetrerie Riunite Verona

Furnace 2​​​​​​​: refractories, steel and equipment engineering. Demolition, supply and erection of equipment, carpentries and refractories, preheating and start-up.

Bormioli Pharma S.p.A.San Vito

Furnace SV1: refractories demolition and draining.

Vetrerie Riunite Verona

DENOX system: complete engineering, equipment supply and start up

Bormioli Rocco Fidenza

Furnace 10: 1) engineering of civil works, carpentries and 3 IS machines positioning. 2)  demolition, reconstruction (refractories, steel), equipment and steel supply, draining, preheating and start-up.

Vetreria Etrusca Altare 

Furnace 2: complete engineering of the new furnace (equipment, refractories, carpentries).